Projects and Experience


Certified Network Contractor Telekom Malaysia (CNC TM)
Scope of Works
Fiber work installation new and upgrading: Civil Work , cable installation, testing and commissioning
Projects
- CNC Central / Eastern / Sabah
When: 2021 to Current
Clients: Telekom Malaysia
Gallery

OSP Fiber Civil Work and Cable Installation - DASH & SUKE Highway
Scope of Works
Cabling Installation- Open Cut/ Laying of GI Pipe/ PN10/Install Street Lighting/Soffit Light/Cable Ladder and Cable Power
Projects
- Supply, Delivery, Installation , Testing, Commissioning and Maintenance of Street Lighting, high Mast and Traffic Light System. - Sungai Besi – Ulu Kelang Elevated Expressway (SUKE Highway )
When: Jan 2021 to Current
Clients: SUKE / KAYCORP
Gallery
Supply and Install Civil, Mechanical & Electrical (CME)
Scope of Works
Supply and install Boom with Bracket antenna / Caging/ Busbar/ Grounding cable/ Power Armour Cable/ Tower Light c/w Power cable/ Chamber/ Cable Ladder c/w Gantry Support/ Feeder Mesh & Feeder Cover/ 2m Boom RRU/ Site Survey.
Projects
- Telco New Site Project CME & Telecomunication Installation (TI). Central / Southern/ Northern/ Eastern/Sabah.
- Telco Site Upgrading CME & TI.
When: 2014 to 2020
Clients: DIG/Maxis/Webe/Celcom
Gallery
Fiber Installation
Scope of Works
Open Cut installation/HDD/Overhead Cable Fiber/ Lay Subduct/ Splicing/ Install Manhole/ Raise Up Manhole/Site Survey/Relocation.
Projects
-
Digi/TIME/Maxis/ Dash Highway/Highway SUKE/ FT54 Ijok JKR
-
Central/Eastern/Northern/Southern/Sabah
When: 2018 to 2020
Clients: Digi/TIME/Maxis/Dash Highway/Highway SUKE/FT54 Ijok JKR
Gallery
ALLO Project
Scope of Works
Installation pole/dp/splitter/fdc/padestal/MH/pvc pipe underground/lay fiber cable/closure/spilicing jointing cable
Projects
-
ALLO FTTH NETWORK INFRASTRUCTURE
-
Ipoh, Bandar Baru Putra,Taman Permai Jaya, Taman Berjaya, Taman Jothi, Sungai Kinta, Pinggir Tanjung Damai, One Berchan Residence
When: May 2021 - Aug 2021
Clients: ALLO Tecnology Sdn. Bhd.
Gallery
Tower Maintenance
Projects
- Tower Rehabilitation program for TM
Scope of Works
- Fully wrap existing tower using new structure, change new 16mm guide wire, foundation expansion and painting works (PERAK (NORTHERN)
- Guide Wire Support Tower Strengthening Works including Enlargement of Foundation for Telekom Malaysia at Kg Bukit Raja Cameron Highland (Pahang).
- Guide Wire Support Tower Strengthening Works including Enlargement of Foundation for Telekom Malaysia at TM Mahang (Kedah).
When:
April 2020, May 2020
Clients: ROHAS EUCO INDUSTRIES BHD / Telekom Malaysia
Tower Maintenance
Projects
- Tower Analysis for Celcom/Edot Co
Scope of Works
- Tower Measurement and Geometry, Tower Inspection
- Tower Audit and Data Collection for Tower Analysis and strengthening project
When:
2019 (On-Going, 600 sites including Sabah & Sarawak)
June 2019 – (15 sites)
Location: Central
Clients: Aerodyne Group /Rendang engineering
Gallery
Polybutene Service and Insulation Cable Service for TNB
Scope of Works
- Change new oil polybutene at cable box transformer.
- Change new insulation cable.
Location: Central
Projects
- Polybutene Service and Insulation Cable Service for TNB
When: 2019 to 2020
Clients: Tenaga Nasional Berhad (TNB)